VACUUM · 316L · SEALING FACE

A chamber flange that stayed flat through passivation.

A Ø260 sealing face that has to stay flat through passivation. The classic failure is not the machining — it is the distortion nobody took out before the finish cut.

Material
316L forged ring
Size
Ø260 × 32 mm
Flatness
0.01 mm
Finish
Passivated, Ra 0.4
Process
Turn-mill + surface grind
Inspection
CMM + flatness report
Typical lead time
10–15 working days
Typical quantity
1–20 pcs

Representative program — figures are typical for this part class, not a specific customer record. Machined at a partner shop we manage; we don't own the machines.

THE PROBLEM

Within tolerance, and still leaking.

The incoming batch met its dimensional drawing. It still failed the leak test, because the flange had been machined from plate in two setups and sent straight to passivation — with no stress relief and no grinding operation.

  • Face was 0.03 mm out of flat by the time it reached the seal
  • Bolt circle torque pulled the part into a different shape
  • Plate stock carried residual stress the drawing never mentioned
What the drawing asked for
Flatness0.01 mm
Surface finishRa 0.8 µm
Bolt circle12 × Ø9, position Ø0.05
Material316L, mill cert required
FinishPassivation, no coating

WHAT WE DID

Five operations, one of them the whole job.

The fix wasn't tighter tolerances — it was moving the distortion upstream of the finish cut and keeping one datum from start to seal.

  1. 1

    Forged stock, not plate

    316L ring blank with mill certificate, chosen for lower residual stress than plate.

  2. 2

    Rough + stress relief

    1.5 mm of stock left on every face, then a stress-relief cycle before finishing.

  3. 3

    Finish from one datum

    OD, bore and bolt circle machined in one setup so the seal face and bolt pattern share a datum.

  4. 4

    Grind the seal face

    Surface ground after machining — the only way to hold a sealing face at this level once the part is released.

  5. 5

    Passivate, then measure

    Nitric passivation with no material removal, then CMM and flatness check on the finished part.

INSPECTION & DOCUMENTATION

The report is part of the part.

A flatness number with no measurement method is a rumour. Every batch ships with the method, the instrument and the datum stated.

  • Flatness checked on a granite plate, reported per part
  • CMM report with datum scheme on the drawing
  • Ra measured on the sealing face, not the OD
  • 316L mill certificate traced to heat number
  • Passivation certificate with bath and batch reference
Flatness0.01 mmGranite + CMM
Ra0.4 µmSealing face
PositionØ0.05Bolt circle
Lead time10–15 daysTypical

WHAT THIS ROUTE GIVES YOU

Flatness that survives the last operation.

On this route we'd quote 10–15 working days for a batch of six, against OEM lead times usually measured in months. The rough–relieve–finish–grind sequence applies to every stainless sealing face we quote — the drawing rarely needs to change.

  • Flatness measured on a granite plate before shipment
  • Distortion removed before the finish cut, not after
  • Bolt circle and seal face share one datum

Have a sealing face that keeps moving?

Send the drawing and tell us how it failed last time. That's usually the most useful line in the RFQ.